Morton Building

Morton Building
RTinVa
Album created by
RTinVa
  • 48
  • 0
  • 0
Our Morton building is nearly complete. We will have to wait until Spring to do the water lines, drain in floor and concrete slab. So far so good. The final electrical inspection is scheduled for today. I had installed 3 locations with 50 amp/30 amp along with standard plugs. Ten 8 foot fluorescents line the ceiling in 3 rows for ample lighting. Motion sensor lighting on the floods outside as well as (2) 500 watt floods on a switch will provide ample lighting outside in front of the building.