Jump to content

Beam

Members
  • Content Count

    1
  • Joined

  • Last visited

  1. Beam

    Pallet Racking

    Step #1: Check the Material A. Check to make certain that all materials have been received. Materials should be checked against the packing lists and Bill of Lading. B. Notify the shipper immediately of any shortages or product damage. Step #2: Check the Area: A. Clear the area where the used Ridg-u-rak pallet racking system (https://www.arkerconfig.com/product-category/pallet-racking/ridgurak/) is to be located. B. Check the area for all obstructions, such as lights, heating ducts, pipes, building columns, etc., to insure a clear area for the installation of the storage rack. Step #3: Lay Out floor: Recommended tools: Tape Measure Chalk Line A. Establish the rack lay out by determining the aisle dimensions and the rack position. B. Snap a chalk line establishing the front edge of the upright bases. The chalk line should run the entire length of the row of rack.
×
×
  • Create New...