-
Content Count
147 -
Joined
-
Last visited
-
Days Won
1
-
Morton Building Updated
Our Morton building is nearly complete. We will have to wait until Spring to do the water lines, drain in floor and concrete slab. So far so good. The final electrical inspection is scheduled for today. I had installed 3 locations with 50 amp/30 amp along with standard plugs. Ten 8 foot fluorescents line the ceiling in 3 rows for ample lighting. Motion sensor lighting on the floods outside as well as (2) 500 watt floods on a switch will provide ample lighting outside in front of the building.
- 48
- 0
- 0
-
-
First outing to check systems. Updated
Here are a few pictures I took during our first outing to check the systems on the new coach. Very minor issues found that required attention by the dealer.
- 5
- 0
- 2
-
2014 FW Expedition 38B with the Kar Kaddy SS Updated
Wanted to share with you all our new addition to the family. We just picked up the Kar Kaddy SS. It has many nice features and is very simple to use. It also folds for storage. This should help when in sites that space is limited.
- 3
- 0
- 0
-
Untitled Album
- 0
- 0
- 0